Phase 4

 

Up

 

The 4 Phases

Phase 4 Toilets to Mid Point

Funding required for contractor doing ground-works. Thereafter work can continue as funding allows the purchase of further materials.

Relatively little ground-works will be required and access for materials is easy. Volunteers may be used for laying the new path and work can continue with relatively little disruption.

PlanPhase4.jpg (25099 bytes)

A     Localised ground-works as necessary, install drainage.

Use contactors for ground-works.

B     Install new path about 2.4metres wide 600metres in length

Forestry Division to supply timber for kerbs and rails.

(Back to top of page)

The Friends of the Glens - Isle of Man Registered Charity no. 928

Web hosted by Domicilium (IOM) Ltd, Domicilium House, 32-34 Malew St., Castletown, Isle of Man. IM9 1AE    www.domicilium.com

Copyright © 2005 Friends of the Glens
Last modified: April 25, 2006